Student Union/Cafetorium
The workers have erected the cafetorium and have installed most of the roof metal. Also, the pictures show the metal being installed on the student union, the slab for the last classroom section and the footers on the gym lobby. In additon, they have installed some of the pre-cast bleachers in the gym.
