Agri/Technology/Science
The contractors have made the following progress: 1. Erected red iron on office area 2. Poured footers on student union 3. Layed external blocks on agri and technology sections. 4. Installed drains under gymnasium 5. Prepared the slab area for pouring on the second half of the science section. The pictures show the progress in the technology area and science section.