Productive Week
The electricians and metal erectors have had a good week. They have made some great progress inside and out. The drywall finishers are currently working on the band/choir section. Also, the contractors have begun to put in the topsoil in front of the building and behind. The picture shows one of two signs that will be at the entrances. The letters are aluminum and will be installed when the signs are completed. You can mouse click the pictures to enlarge them. After you enlarge them, you can easily see the parking lot and irrigated islands in the background and beyond that and to the left as you are facing the sign is the area the football/soccer/field and track will be built.