Storm Drain Prevention Plan/Silt Fence
The contractor and surveyor were on the site yesterday to begin the installation of the silt fence around the perimeter of the work zone in accordance with the requirements of the storm drain prevention plan. This fence is required to prevent soil from eroding out of the containment area. Work should begin as soon as weather permits on the excavation.

<< Home