Curbs Installed

John Brown and Sons Contruction have the sub-contract to install almost 2 miles of curbs around the roads and parking lot. They also have the contract to install the concrete on the building. Both of these pictures are views of the curbs being installed at the first intersection between the road and parking lot as you enter from the LaCrosse Road. The parking lot and building would be to the right and the football/soccer/track field would be to the left.

<< Home